1 - reinforced concrete floor with a thickness of B = min. 150 mm
2 - metal pipes with a diameter D1, D2 and a pipe wall thickness t1, t2
3 - Tubolit PE insulation on metal pipes, thickness "g" (continuous insulation)
thickness a1 = min. 1.2 mm
5 - electrically clamped band or adhesive tape
6 - Multitube fireproof intumescent tape [hxs] mm, placed inside the floor, at
a distance of 15 ± 5 mm from the underside of the floor
7 - fireproof paste Flame Cabel I Paste on metal pipes with PE insulation,
length L = min. 300 mm and thickness g1 = min. 1.2 mm
8 - the space between the floor and the penetration, filled
with cemenent mortar, approx. 25 mm.