ZZ 230 BLOCK Fire Protection Filling - Application 1 | Carboline Polska
top of page
logo_eu.9ac04f85.png
LSSE-logo-main.png

 >>  PRODUCTS  >>  ZZ PRODUCTS  >>  ZZ 230 BLOCK  >>  APPLICATION

1 - wall thickness B ≥ 200 mm
2 - cables, cable bundles with or without tubes (max.hole filling up to 60%)  
  surface area)
3 - pre-insulated metal pipes
4 - plastic tubes with or without cables
5 - ZZ 230 Block

* Detailed information can be found at ETA

Place the cables and pipes in the hole
Fill the empty space between the partition and the cables and pipes with ZZ 230 blocks. Cut the blocks so that they perfectly fill the entire space
View of a properly sealed mixed penetraion with ZZ 230 Blocks
Mark the completed penetration with the attached label, mark ZZ 230 Block on it, enter the date and name

METHOD OF SEALING CABLES, CABLE BUNDLES, PRE-INSULATED METAL PIPES, PLASTIC PIPES WITH CABLES OR WITHOUT PENETRATING WALLS AND FLOORS ACCORDING TO ETA-10/0431*

APPLICATION OF ZZ 230 BLOCK IN MIXED PENETRATION SEALS

bottom of page