1 - flexible or rigid wall, thickness B = min. 100 mm
2 - plastic pipe, diameter "D" and pipe wall thickness "t"
3 - Multitube fireproof intumescent tape (inside), dimensions [hxs], placed
   centrally inside the wall
4 - electrically clamped band or adhesive tape
5 - the gap between the pipe and the partition with a maximum width of a = 30
   mm, filled with mineral wool with a density of min. 60 kg / m3
6 - gypsum mortar with a thickness of g1 = 5 mm

1 - reinforced concrete ceiling with a thickness of B = min. 150 mm
2 - plastic pipe, diameter "D" and pipe wall thickness "t"
3 - mineral wool with a density of min. 50 kg / m3 (continuous insulation)
4 - Flame Cabel A Paste on both sides of the floor; length a1 = min.
   50 mm, thickness g1 = min. 0.6 mm, width a2 = min. 50 mm,
   thickness g2 = min. 0.6 mm
5 - Multitube fireproof intumescent tape [hxs] mm, placed inside the floor, at  
   the distance of 15 ± 5 mm from the underside of the floor
6 - the space between the floor and the penetration, filled
   cement mortar, approx. 25 mm

If necessary, it is possible to continue the mineral wool insulation along the entire length of the pipe:
 
1 - mineral wool with a density of min. 50 kg / m3 (continuous insulation)
2 - Flame Cabel A Paste on both sides of the wall; length a1 = min. 50 mm,
   thickness g1 = min. 0.6 mm width a2 = min. 50 mm, thickness g2 = min. 0.6 mm

* Detailed information can be found at ETA