 >>  PRODUCTS  >>  FIREPROOF MASSES AND PASTES  >>  FLAME CABEL A PASTE  >>  APPLICATION

1 - rigid wall with a density of min. 600 kg / m3 and thickness B ≥ 150 mm or rigid floor
  with a density of min. 1700 kg / m3 and thickness B ≥ 150 mm
2 - 2 mineral wool boards density of min. 150 kg/m3, with a thickness of a ≥ 50 mm,
  
  coated with Flame Cabel A Pasta with a thickness t1 ≥ 1.2 mm; b ≥ 50 mm (space
  between the boards)
3 - fireproof paste Flame Cabel A Paste, length ≥ 50 mm and thickness ≤ 5.0 mm
4 - fireproof paste Flame Cabel A Paste on both sides of the wall or floor

  (on a ring), length d ≥ 60 mm
  and thickness t2 ≥ 0.6 mm

1 - rigid wall with a density of min. ≥ 600 kg / m3 and thickness min. 150 mm
2 - 2 mineral wool boards with a density of min. 150 kg / m3 and thickness a ≥
 
  50 mm, covered with Flame Cabel A Paste, thickness g1 ≥ 1.2 mm; b ≥ 50 
  mm (space between boards)
3 - fireproof paste Flame Cabel A Paste; length ≥ 50 mm, thickness ≤ 5.0 mm
4 - Flame Cabel Paste and fireproof paste on both sides of the partition

  (on a partition); length d ≥ 60 mm, thickness g2 ≥ 0.6 mm
5 - fireproof coating Flame Cabel Coating on both sides of penetration, on cable and

  cable tray (dimensions hxs); cover over a length of L1 ≥ 300 mm i 
  thicknesses ≥ 1.2 mm
6 - empty space in cable tray filled with mineral wool with a density of 
min. 40 kg / m3

1 - rigid floor with a density of min. 1700 kg / m3 and a thickness of min. 150 mm
2 - 2 mineral wool boards with a density of min. 150 kg / m3 and thickness a ≥
 
  50 mm, covered with Flame Cabel A Paste, thickness g1 ≥ 1.2 mm; b ≥ 50 
  mm (space between boards)
3 - fireproof paste Flame Cabel A Pasta; length ≥ 50 mm, thickness ≤ 5.0 mm
4 - fireproof paste Flame Cabel A Paste on both sides of the partition

  (on a parition ), length d ≥ 60 mm and thickness g2 ≥ 0.6 mm
5 - Flame Cabel Coating the coating on both sides of penetration, on the cable and

  cable tray (dimensions hxs); covered over a length of L1 ≥ 300 mm i 
  thicknesses ≥ 1.2 mm
6 - empty space in cable tray filled with mineral wool with a density of 
min. 40 kg / m3

1 - plastic pipe; distance u ≤ 10 mm
2 - CarboCollar CC fireproof collar, installed on both sides of the partition
3 - mineral wool with a density of 150 kg / m3; with dimensions of min. 50x50x50 mm
4 - M6 anchor steel bolts (A1), pad, 2 pcs (A2), steel nut  
  (A3), fireproof paste Flame Cabel A Paste (A4)
5 - construction details of mixed penetraion
6 - rigid wall with a density of min. 600 kg / m3 and thickness B ≥ 150 mm

1 - plastic pipe; distance u ≤ 10 mm
2 - CarboCollar CC fireproof collar, installed on the underside of the floor
3 - mineral wool with a density of 150 kg / m3; with dimensions of min. 50x50x50 mm
4 - M6 anchor steel bolts (A1), pad, 2 pcs (A2), steel nut
   (A3), fireproof paste Flame Cabel Paste A (A4)
5 - construction details of a mixed penetration
6 - rigid floor with a density of min. 1700 kg / m3 and thickness B ≥ 150 mm

1 - metal pipe; distance u ≤ 15 mm
2 - CarboCollar CC fireproof collar, installed on both sides of the partition,

  outside 
3 - mineral wool with a density of 150 kg / m3; with dimensions of min. 50x50x50 mm
4 - M6 anchor steel bolts (A1), pad, 2 pcs (A2), steel nut

  (A3), fireproof paste Flame Cabel A Paste (A4)
5 - construction details of a mixed penetration
6 - rigid wall with a density of min. 600 kg / m3 and thickness B ≥ 150 mm
7 - insulation made of flexible elastomeric foam (FEF)

1 - metal pipe; distance u ≤ 15 mm
2 - CarboCollar CC fireproof collar, installed on both sides of the partition,

  outside,
3 - mineral wool with a density of 150 kg / m3; with dimensions of min. 50x50x50 mm
4 - M6 anchor steel bolts (A1), pad, 2 pcs (A2), steel nut

   (A3), fireproof
 paste Flame Cabel A Paste (A4)
5 - construction details of a mixed penetration
6 - rigid floor with a density of min. 1700 kg / m3 and thickness B ≥ 150 mm
7 - insulation made of flexible elastomeric foam (FEF)

1 - metal pipe, diameter "D", pipe wall thickness "t"
2 - mineral wool with a density of min. 40 kg / m3; length L ≥ 500 mm,
 
  thickness in ≥ 50 mm
3 -
fireproof
 paste Flame Cabel A Paste; with a length of s1 ≥ 60 mm, with a thickness g1 ≥
  0.6 mm, with a length s2 ≥ 60 mm, with a thickness g2 ≥ 0.6 mm
4 - the space between the pipe insulation and the transition seal is filled
 
    fireproof
 paste Flame Cabel A Paste with a thickness of u ≤ 5 mm
5 - construction details of a mixed penetration
6 - rigid wall with a density of min. 600 kg / m3 and thickness B ≥ 150 mm

1 - metal pipe, diameter "D", pipe wall thickness "t"
2 - mineral wool with a density of min. 50 kg / m3; with a length L ≥ 500 mm, o
 
  thickness in ≥ 50 mm
3 -
fireproof paste Flame Cabel A Paste; with a length of s1 ≥ 60 mm,
  with a thickness g1 ≥ 0.6 mm, with a length s2 ≥ 60 mm, with a thickness g2 ≥ 0.6 mm
4 - the space between the pipe insulation and the penetraion is filled
 
  fireproof
 paste Flame Cabel A Paste with a thickness of u ≤ 5 mm
5 - construction details of a mixed penetration
6 - rigid floor with a density of min. 1700 kg / m3 and thickness B ≥ 150 mm

1 - metal pipe with a diameter D ≤ 273 mm and a pipe wall thickness "t" from 6.0 to 14.2 mm
2 - fireproof paste Flame Cabel I Paste, length L ≥ 500 mm,

   with a thickness of g2 ≥ 1.2 mm
3 - fireproof paste Flame Cabel I Paste, length s1 ≥ 50 mm,
   with a thickness of g1 ≥ 0.6 mm
4 - the space between the pipe insulation and the penetration seal

   fireproof
 paste Flame Cabel I Paste; with the thickness of u ≤ 5 mm
5 - construction details of a mixed penetration
6 - rigid floor with a density of min. 1700 kg / m3 and thickness B ≥ 150 mm

* Detailed information can be found at ETA

Fill the hole in the wall on both sides with mineral wool boards with a minimum density of 150 kg / m3 and a minimum thickness of 50 mm

Using a spatula, apply a 1.2 mm thick layer of Flame Cabel A Paste on the wool.

Sealing of wool and partition with the fireproof paste Flame Cabel A Paste should be done on both sides of the partition

Seal pipes and cables in accordance with the instructions in the information leaflet or product catalog
Mark the penetration seal with the attached label, mark the Carboline materials used on it, enter the date and name

CONSTRUCTION DETAILS OF MIXED PENETRATION ACCORDING TO ETA-16/0732*

APPLICATION OF FLAME CABEL A PASTE ON MIXED PENETRATION SEAL OF PIPES AND CABLES PENETRATING A WALL OR FLOOR

CONSTRUCTION DETAILS OF MIXED PENETRATION ACCORDING TO ETA-16/0732*

METHOD OF SEALING MIXED PENETRATION OF PIPE PENETRATING WALL AND FLOOR ACCORDING TO ETA-16/0732*

METHOD OF SEALING OF MIXED PENETRATION OF PLASTIC PIPE (WITH FEF FLEXIBLE ELASTOMER FOAM INSULATION) PENETRATING WALL AND FLOOR ACCORDING TO ETA-16/0732*

METHOD OF SEALING MIXED PENETRATION OF METAL PIPE (WITH MINERAL WOOL INSULATION) PENETRATING WALL AND FLOOR
ACCORDING TO ETA-16/0732*

APPLICATION OF FLAME CABEL A PASTE ON MINERAL WOOL PIPE INSULATION PENETRATING FLOOR*