top of page
logo_eu.9ac04f85.png
LSSE-logo-main.png

 >>  PRODUCTS  >>  FIREPROOF MASSES AND PASTES  >>  FLAME CABEL COATING  >>  APPLICATION

1 - floor with a minimum thickness of 150 mm
2 - cable tray
3 - cables with a diameter of max. 21 mm
4 -
fireproof
 Flame Cabel Coating; on both sides of the floor,
  length L = min. 300 mm, depth k = min. 30 mm,
  thickness g2 = min. 1.2 mm
5 - Flame Cabel Coating, on both sides of the floor,

   dimensions: f = min. 50 mm, e = min. 50 mm, g1 = min. 0.6 mm
6 - mineral wool, density 50 kg / m3, thickness w = max. 40 mm

1 - flexible or rigid wall with a thickness of min. 125 mm
2 - cable tray
3 - cables with a diameter of max. 21 mm
4 -
fireproof 
Flame Cabel Coating; on both sides of the partition,
  of length L = min. 300 mm, depth k = min. 30 mm,
  thickness g2 = min. 1.2 mm
5 -
fireproof
  Flame Cabel Coating, on both sides of partition, dimensions:
  f = min. 50 mm, e = min. 50 mm, g1 = min. 0.6 mm
6 - mineral wool, with a density of min. 50 kg / m3, thickness w = max. 40 mm

1 - flexible or rigid wall with a thickness of min. 100 mm
2 - single cable with a diameter of max. 13 mm
3 -
fireproof
 Flame Cabel Coating dimensions:
  length L = min. 300 mm, thickness h = min. 1.2 mm,
  length l1 = min. 50 mm, thickness h1 = min. 0.6 mm
4 - space between the pipe and the partition structure, max.
 
   a = 30 mm, filled with mineral wool with a density of min. 50 kg / m3
5 - gypsum mortar with a thickness of min. g1 = 5 mm

Fill the hole in the wall on both sides with mineral wool boards with a minimum density of 50 kg / m3 and a maximum thickness of 40 mm
Using a brush, apply a 0.6 mm thick layer of Flame Cabel Coating on the wool over a length of min. 50 mm from the cable tray
Apply on the cables and cable tray a layer of fireproof Flame Cabel Coating with a brush. Coating with a thickness of min. 1.2 mm on the length of min.
300 mm from the partition
Mark the penetration with the attached label, mark Flame Cabel Coating on it, enter the date and name
Fill the space between the cable and the partition tightly. Use mineral wool with a density of min. 50 kg / m3 or cement mortar
Using a brush, apply Flame Cabel Coating on the partition in such a way that a ring with a width of min. 50 mm and a thickness of min. 0.6 mm is created
Apply Flame Cabel Coating on the cable so that a ring with a width of min. 300 mm and a thickness of min. 1.2 mm is created
Mark the penetration with the attached label, mark Flame Cabel Coating on it, enter the date and name
Fill the space between the cable and the partition tightly. Use mineral wool with a density of min. 50 kg / m3 or cement mortar

Using a brush, apply Flame Cabel Coating on the partition in such a way that a ring with a width of min. 50 mm and a thickness of min. 0.6 mm is created

Apply Flame Cabel Coating on the cable so that a ring with a width of min. 300 mm and a thickness of min. 1.2 mm is created

Mark the penetration with the attached label, mark Flame Cabel Coating on it, enter the date and name

FLAME CABEL COATING SELECTION TABLE

METHOD OF SEALING CABLE TRAY WITH CABLES INSIDE, CABLE BUNDLES AND SINGLE CABLES PENETRATING WALL AND FLOOR
ACCORDING TO ETA-16/0732

APPLICATION OF FLAME CABEL COATING ON CABLE TRAY PENETRATING WALL OR FLOOR

APPLICATION OF FLAME CABEL COATING ON A SINGLE CABLE PENETRATING WALL OR FLOOR

APPLICATION OF FLAME CABEL COATING ON A CABLE BUNDLE PENETRATING WALL OR FLOOR

bottom of page